Working procedure
- Log incoming cable with its insulation status.
- Ask the processor for the measured recovered output.
- Keep input and output in different fields when reporting yield.
Apply it to a case
An electrical contractor separates stripped copper and cable with insulation still attached. A recovery merchant weighs each stream.
Bare copper: 180 kg Insulated cable: 240 kg
The transfer totals 0.42 tonnes. Insulated cable includes its sheath, so its full weight is not recovered copper.
Try this example