How to handle unknown waste destinations

An assumed recycling percentage makes a mixed-load total look more certain than the source documents allow.

Working procedure

  1. Record the whole load as mixed with destination pending.
  2. Request a sorting statement covering the relevant collection period.
  3. Store the source and period alongside any later allocation.

Apply it to a case

A builder receives two dockets for mixed skips. No sorting statement has arrived from the collector.

Mixed skip Monday: 1.8 t
Mixed skip Thursday: 2.1 t

The recorded outbound mass is 3.9 tonnes. The destination split is still unknown.

Try this example