Working procedure
- Record the whole load as mixed with destination pending.
- Request a sorting statement covering the relevant collection period.
- Store the source and period alongside any later allocation.
Apply it to a case
A builder receives two dockets for mixed skips. No sorting statement has arrived from the collector.
Mixed skip Monday: 1.8 t Mixed skip Thursday: 2.1 t
The recorded outbound mass is 3.9 tonnes. The destination split is still unknown.
Try this example