Clean concrete rubble
A demolition supervisor has one weighbridge ticket for rubble and a separate line for packing timber. The site wants material totals before collection.
Worked example
Clean concrete: 6800 kg Packing timber: 0.35 t
The register totals 7.15 tonnes. The concrete and timber remain separate entries for follow-up with their respective receivers.
Load register
Estimate avoided emissions (optional)
Result
7.15 tonnes
- Clean concrete6.8 tList a lot
- Packing timber0.35 tList a lot