Working procedure
- Keep the original dispatch entry and ticket.
- Record the rejected quantity and reason supplied by the receiver.
- Link the replacement collection to the original load to avoid counting two dispatches as two material sources.
Apply it to a case
An interior contractor weighs dry plasterboard scraps and a contaminated fraction at the end of a fit-out.
Dry plasterboard: 1.75 t Contaminated plasterboard: 250 kg
The load weighs 2 tonnes, of which 1.75 tonnes is labelled dry. Obtain receiver confirmation before assigning a recovery outcome.
Try this example