Skip to content
WasteTraceList a lot

Plasterboard separation

An interior contractor weighs dry plasterboard scraps and a contaminated fraction at the end of a fit-out.

Worked example

Dry plasterboard: 1.75 t
Contaminated plasterboard: 250 kg

The load weighs 2 tonnes, of which 1.75 tonnes is labelled dry. Obtain receiver confirmation before assigning a recovery outcome.

Load register

Load 1
Load 2
Estimate avoided emissions (optional)

Result

2 tonnes

Saved registers

No registers saved on this device.

Related reading

How to record rejected recycling loads